Soil Test
Completed
Hizlahati Jamia Islamia Darul Quran Madrasa & Etimkhana
Project Status
Completed
Completion Date
-
Boreholes
3
Maximum Depth
50 ft
Building Type
-
Total Floors
3 Floors
Land Area
3 Decimal
Location
Hizlahati, Bawipara, Kaliakair, Gazipur
Services Provided
Soil Test
Project Gallery

Project Overview
Foundation design should be finalized by a qualified structural/geotechnical engineer based on the actual SPT values, laboratory test results, groundwater condition, and structural load requirements.
Lab Tests Equipment Used & Followed Standards
Rotary Drilling Rig Tripod Split Spoon Shelby Tube SPT Hammer
Soil Test Summary (Sample)
| Depth (ft) | Soil Type | SPT N-Value | Remarks |
|---|---|---|---|
| 0 - 5 | Fill / Loose Soil | 5 - 8 | Low bearing |
| 5 - 20 | Silty Clay | 8 - 15 | Medium dense |
| 20 - 40 | Sandy Silt | 15 - 25 | Suitable |
| 40 - 90 | Dense Sand | 25 - 40 | Good bearing |
Project Location
Related Projects
Completed
Soil Test
Mohammadpur soil test
Mohammadpur
Completed
Soil Test
Bashundhara, N Block, Road 33 soil testing work
bashundhara, n block, road 33
Completed
Soil Test
Soil Investigation at Narayanganj, Bangladesh
Rabbani Nagar, Narayanganj
Completed
Soil Test
Soil Investigation for Proposed G+09 (10-Storied) Residential Building
Holding No-99/54, Mouza-Dakshinkhan, P.S.-Cantonment, Dhaka
Completed
Soil Test
Soil Test Bashundhara Residential Area
Bashundhara Residential Area
Completed
Soil Test
Sub Soil Investigation Jolshiri, Dhaka, Bangladesh
Jolshiri, Dhaka, Bangladesh
- Location : Hizlahati, Bawipara, Kaliakair, Gazipur
- Project Date: September 2026
- Plot Size: 3 Katha
- Floors : 3
- Service Category : Soil Test
- Borehole Depth : 50
- Plot Size: 3 Katha
- Ground Water : 14
- Equipment Used : Rotary Drilling Rig Tripod Split Spoon Shelby Tube SPT Hammer
- Standards Followed : BNBC, ASTM , AASHTO, BS, IS Code
- LABORATORY TESTS : Moisture Content Grain Size Analysis Atterberg Limit Unconfined Compression Direct Shear Specific Gravity Consolidation Triaxial Test
Engineering Insights: Three boreholes up to 50 ft depth were conducted to assess subsurface soil conditions and provide engineering data for the proposed 3-storey foundation. Final foundation recommendations should be based on the complete field and laboratory test results.
Recommendation : Foundation design should be finalized by a qualified structural/geotechnical engineer based on the actual SPT values, laboratory test results, groundwater condition, and structural load requirements.